Cadia’s Principal Engineer, Sean Galvin undertook a full elution review in 2020 to assist with Randgold’s Loulo complex de-bottle necking of their elution system at their site in Mali. The review combined first hand inspections at site with desktop reviews of the design to highlight......

Cadia has provided electrowinning and sludge recovery systems worldwide, with installations including Gold Fields Agnew, Northern Star Thunderbox, Pantoro Norseman, Wesdome Canada among others. Our expertise also extends to installation and with a number of sites Cadia has either directly installed our supplied systems or......

Cadia Systems expertise in LEV led to us being the designer and installation company for WestGold’s Fortnum Airconditioning System. Comprising the airconditioning thermal and flow modelling, Cadia selected the optimial unit, designing both upper electrowinning floor mezzanine ducting to provide fresh air flow to operators......

Cadia Systems is unique in designing and/or directly manufacturing most of the equipmentthat goes into its elution, regeneration and goldroom systems. This extends to direct heaters, electrowinning cells, smelting furnaces, extraction fans and exhausts and down to carbonmoulds. Cadia has delivered significant equipment internationally including......

Cadia System provided equipment for the site reticulated build including manufacturing ofproprietary equipment including a 800kW direct elution heater and burner control system,CIP electrowinning cells and rectifiers and a 75kg/hr Cadia KX diesel fired regeneration kilnsystem....

Cadia Systems has been involved routinely on Garden Island for inspections of pressurevessel and boiler systems as part of their In-Service Inspection requirements under AS4788.Additionally, Cadia was tasked with undertaking design replacements for oxygen deliverysystems for the SETF facility for diver breathing supplies as well......

Cadia Systems designed the plant process instrumentation and control philosophy for theGlobal Advanced Metals Tantalum Furnace under DRA. This included the necessary safetyand control interlocking, process control sequencing, instrumentation selection and alarmreporting. The system included delivery of a direct fired burner system with extractive baghouse......

Cadia designed a modular 1.5T elution system for the Mt Bobby operation to assist with thegeneration of startup cash flow generation for the mine. This included Cadia’s proprietaryboilers, columns, control design concepts and CIP electrowinning cells. The system has chevied great success with strip times......

Cadia also undertook the design and fluid computational fluid dynamic modelling of Gruyeres goldroom extraction and ventilation systems. This included thermal modelling of flows, equipment selection and preparation of a detailed CFD report for submission to DMIRS as part of the approvals process. Part of......

Monadelphous approached Cadia systems to provide conceptual designs and handling procedures which would allow them to undertake repairs to over 200 rail wagons at FMG’s Port Hedland Rail Maintenance Facility. Prior to Cadia’s involvement in the project, wagons were removed from their bogies by use......

Cadia undertook the full design of a 1.7km underground buried natural gas consumer gas pipeline, including pressure reducing station, to replace the existing Kleenheat LPG services. The scope included the engineering design and specification, project management and supervision of the civil contractors, pressure testing and......